Posted by xBNSFer on September 14, 2020 | |
By the time I worked in Hillyard (on occasion), The GN main was severed as a through route in Spokane in favor of the NP route through the city and Yardley yard, and Hillyard was a 3 or 4 track facility used by locals.
|
|