With the Thursday D-L crew working BR-1(?), PO-74 power waits. Wide cab leader to the mill today.
Passing ARMY, headed straight to the mill.
M420W leader, along with three six axles units running PO-74 straight to Arden Mill.
End of the day.
It is off to shuttle gondolas this morning for this M420W and C425. There is another M420W headed to the Delaware- Lackawanna so paired wide cabs are not outlandish in the future.
Waiting to start the workday.
On a beautiful morning of Friday the Thirteenth, I am lucky enough to arrive in Olyphant just in time to capture SC-7 crossing the former Delaware & Hudson bridge on what was part of the Penn Divi... (more)
Drilling Bridge 60.
Slated for shop time?
Starting the workday.
Moving up to the former D&H Grennville yard to pick up covered hoppers.
Four and six axle lash ups wait for their respective crews.
PT98 heads around the curve at Elmhurst enroute to the NS interchange at Slateford.
A Delaware Lackawanna crew shoves east through East Stroudsburg after rearranging their consist at Gravel Place. The crew will spend an hour or so working WestRock in Delaware Water Gap before re... (more)
M420W up on blocks. Front truck in shop.