The crew are heading back to Fresh Pond after switching Kleet Lumber in Huntington. Kleet Lumber is the last customer in Huntington and is switched weekly.
Non-stop run to Fresh Pond from Brookhaven National Lab. The crew is running low level rad waste from a cleanup at the lab. A CSX crew will be waiting at Fresh Pond to move the train out. These ty... (more)
After returning from Riverhead we see NYAR MP15AC 151 and GP38-2 270 retrieving the rest of their train at the LIRR Yaphank Station (YA Block) before heading west. The crew travelled to Riverhead ... (more)
LIRR track workers are back working after the RS 40 has passed. The crew are on the way to Kleet Lumber for their weekly switch. Unfortunately the work caused both eastbound and westbound moves to... (more)
The crew is waiting for the LIRR Riverhead train to head into the station. They will leave westbound out of LD Siding to Paraco Gas. Back to Pine Aire after their stop at Paraco.